Identifikasi Risiko Yang Mempengaruhi Pelaksanaan Proyek Konstruksi Jalan di Kota Palu Berdasarkan Persepsi Konsultan
DOI:
https://doi.org/10.22487/renstra.v3i1.411Keywords:
road construction, risk, consultant, implementationAbstract
In the implementation of a road construction project in any form and anywhere will never avoid risk, both small risk and big risk. The larger the scale of a construction project, the greater the possibility of risks that will occur if these risks are not managed properly. The purpose of this study was to identify risks that affect the implementation of road construction projects based on the perceptions of the consultants. Primary data was collected through the distribution of questionnaires to consulting companies that have supervised the implementation of road construction. The data was processed using descriptive statistics, Relative Rank Index (RRI) and Correlation Analysis. The results showed that 5 dominant risks were identified that affected the implementation of road construction based on the consultant's perception, namely 1) Using inappropriate work methods would make work late (RRI = 0.896), 2) Wrong Planning Data of DED (Detail Engineering Design) that resulted in frequent design review (RRI = 0.880), (3) inefficient use of heavy equipment makes work productivity not achieved according to plan (RRI = 0.864), (4) limited field workers resulting in productivity cannot be maximized (RRI = 0.864, (5) maintenance affects the level of damage to heavy equipment (RRI = 0.824). The risk of using an inappropriate work methods would make the work late is strongly correlated with the risk of limited field workers resulting in productivity cannot be maximized, with a correlation value of 0.542.
Downloads
References
Nurlela and H. Suprapto, “Identifikasi dan Analisis Manajemen Risiko Pada Proyek Pembangunan Infrastruktur Bangunan Gedung Bertingkat”, Jurnal Ilmiah Desain dan Konstruksi, vol. 13, no. 2, p. 114, 2014.
N.B. Santoso, Analisis Manajemen Risiko Pada Proyek Pembangunan Jalan Tol (Studi Kasus Proyek Pembangunan Jalan Tol SoloNgawi-Kertosono Ruas Ngawi-Kertosono Paket 3), Surakarta: Universitas Muhammadiyah Surakarta, Indonesia, 2017.
R.T.B.N. Utama, E.W. Setyowati, and Harimurti, “Analisis Tingkat Risiko Proyek Pelaksanaan Pemeliharaan Jalan Untuk Meningkatkan Kinerja Mutu Proyek Jalan di Kabupaten Malang”, Rekayasa Sipil, vol. 11, no. 3, p. 211, 2017.
I. Soeharto, Manajemen Proyek Jilid 1, Jakarta: Erlangga, 1999.
F. Nento, Identifikasi Resiko Perusahaan Kontraktor Terhadap Tenaga Kerja Dalam Pelaksanaan Pekerjaan Konstruksi Jalan di Kota Palu”, Palu: Universitas Tadulako, 2012.
R. Flanagan and G. Norman, Risk Management and Construction, London: Blackwell Science, 1993.
P. Suartana, R. Mandagi, and D. Wilar, “Pengaruh Pengetahuan Keselamatan dan Kesehatan Kerja (K3) Terhadap Perilaku Pekerja dan Kecelakaan Kerja Pada Proyek di DS LNG Kabupaten Banggai Propinsi Sulawesi Tengah”, RTCEJRD, vol. 2, no. 1, p. 15, 2021.
T. Syammaun, J. Amin, And Fachri, “Manajemen Risiko Proyek Konstruksi Jalan (Studi Kasus: Preservasi Rekonstruksi Jalan Lambaro –Bts. Pidie)”, Jurnal Teknik Sipil, vol. 8, no. 2, p. 64, 2019.
Hamdani, M. Isya, Hafnidar, and A. Rani, “Analisis Risiko Penawaran Underestimate Cost Terhadap Kualitas Proyek Konstruksi Jalan di Provinsi Aceh”, Jurnal Teknik Sipil, vol. 1, no. 2, p. 511, 2017.
N.P.M. Astiti, I. N. Norken, and I.B.N. Purbawijaya, “Analisis Risiko Pelaksanaan Pembangunan Jalan Tol Benoa Bandara – Nusa Dua”, Jurnal Spektran, vol. 3, no. 2, p. 84, 2015.
M. Faisal and A.T. Tenriajeng, “Analisis Risiko Pada Tahap Pelaksanaan Konstruksi Jalan Tol Cinere – Jagorawi, Depok”, ”, Jurnal Kacapuri, vol. 4, no. 2, p. 223, 2021.
H.A. Gulindo, “Analisis Manajemen Risiko yang Mempengaruhi Kontraktor Pada Pelaksanaan Proyek Jalan dan Gedung di Kabupaten Malinau-Kalimantan Utara”, Jurnal Indonesia Sosial Teknologi, vol. 2, no. 5, p. 805, 2021.
R. Hidayati, M. Natalia, F. Adibroto, M. Mafriyal, Yurisman, and R. Saskia, “Analisis Variabel-Variabel Risiko pada Pelaksanaan Proyek Konstruksi Jalan”, Jurnal Ilmiah Rekayasa Sipil, vol. 14, no. 2, p. 46, 2017.
S.V.N. Kalangit, F.J. Manoppo, and S.S. Lumeno, “Model Pengelolaan Risiko Pada Pembangunan Jalan Lingkar Utara Siau Guna Peningkatan Kinerja Proyek”, Jurnal Sipil Statik, vol. 7, no.1, p. 1, 2019.
A. Rusdini, Identifikasi Resiko Perusahaan Kontraktor Terhadap Faktor Produktivitas Alat Berat Pada Pelaksanaan Pekerjaan Proyek Jalan di Kota Palu, Palu: Universitas Tadulako, 2012.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2022 REKONSTRUKSI TADULAKO: Civil Engineering Journal on Research and Development
This work is licensed under a Creative Commons Attribution 4.0 International License.