Pengaruh Metode Pelaksanaan Terhadap Kinerja Waktu Proyek Rekonstruksi Jembatan di Kota Palu
DOI:
https://doi.org/10.22487/renstra.v6i1.724Keywords:
implementation method, time performance, project, reconstruction, bridgeAbstract
The bridge reconstruction project is an effort to rebuild bridges that have been destroyed by the earthquake and tsunami that hit Palu City. The implementation of the bridge reconstruction project has complicated work that raises an analysis of the effect of the bridge project implementation method on project time performance. The purpose of this study was to determine the effect of implementation methods on the time performance of the bridge reconstruction project in Palu City. The sample of this study amounted to 22 workers on the bridge reconstruction project using Purposive Sampling method. The field collection process was carried out by collecting primary data in the form of interviews and distributing questionnaires. The data were processed using descriptive statistics and multiple linear regression analysis. The results of this study indicate that partially of the five variabels affecting the implementation method, the material factor variabel has a significant effect on the time performance of the bridge reconstruction project. While simultaneously work methods, labor, material factors, equipment, and project site conditions have an effect of 8,988 with a significant 0.000 on the variabel time performance of the bridge reconstruction project in Palu City.
References
A.N. Winarno, A.N. Pakpaham, S. Tudjono, and N. Nuroji, “Perencanaan Jembatann Leho Kawasan Pesisir Kabupaten Karimun, Kepulauan Riau, dengan Struktur Jembatann Pelengkung (Arch Bridge)”, Jurnal Karya Teknik Sipil, vol. 2, no. 4, p. 105, 2013.
W. Jawat, “Metode Pelaksanaan Pekerjaan Pondasi (Studi: Proyek Fave Hotel Kartika Plaza)”, Paduraksa, vol. 4, no. 2, p. 22, 2015.
W. Tyas and P.H. Waskito, “Analisa Faktor-Faktor Penyebab Keterlambatan Proyek Pembangunan Jembatan Joyoboyo, Jurnal Rekayasa dan Manajemen Konstruksi, vol. 9, no. 2, p. 71, 2021.
Nirmalawati and M. Labombang,
“Faktor yang Mempengaruhi Pekerjaan Ulang dan Penerapan RMK pada Pelaksanaan Konstruksi Jembatan di Provinsi Sulawesi Tengah”, Prosiding Seminar Nasional Teknik Sipil UMS, vol. 6, p. 201, 2016.
R. Sugiharto, “Analisis Faktor-faktor Dominan Manajemen Risiko terhadap Kinerja Keuangan Proyek Tahap Konstruksi”, Jurnal Teknik Sipil dan Lingkungan Universitas Nusa Putra (J-Teslink), vol. 1, no. 3, p. 1. 2020.
Julsena, Abdullah, and A. Rauzana, “Faktor Sisa Material Yang Mempengaruhi Biaya Pada Pelaksanaan Proyek Konstruksi Gedung di Provinsi Aceh”, Jurnal Arsip Rekayasa Sipil dan Perencanaan, vol. 1, no. 4, p. 148, 2018.
Y.I. Puspitasari, J.B. Mangare, and P.A.K. Pratasis, “Analisis Faktor-Faktor Keterlambatan Pada Proyek Perumahan Casa De Viola dan Alternatif Penyelesaiannya”, Jurnal Sipil Statik, vol. 8, no. 2, p. 1, 2020.
S.A. Gumolili, B.F. Sompie, and J.P. Rantung, “Analisa Faktor-Faktor Penyebab Change Order dan Pengaruhnya Terhadap Kinerja Waktu Pelaksanaan Proyek P-2 Konstruksi di Lingkungan Pemerintah Provinsi Sulawesi Utara”, Jurnal Ilmiah Media Engineering, vol. 2, no. 4, p. 247, 2012.
S.A. Maharani, S. Sari, M. As’adi, and A.P. Saputro, “Analisis Risiko Pada Proyek Konstruksi Perumahan dengan Metode House of Risk (HOR) (Studi Kasus: Proyek Konstruksi Perumahan PT ABC)”, Journal of Integrated System, vol. 5, no. 1, p. 16, 2022.
M.R. Mustamin, A.R. Suleman, H. Djufri, B. Asrun, A.A.I. Mawarni, M.F.H. Putri, and M. Tuwo, “Risiko Keterlambatan Waktu pada Pelaksanaan Proyek Pembangunan Bendungan Pamukkulu dengan Metode Matriks Risiko dan Metode AHP”, Konstruksia, vol. 15, no. 1, p. 145, 2023.
D.M. Wirabakti, R. Abdullah, and A. Maddeppungeng, “Studi Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Bangunan Gedung”, Konstruksia, vol. 6, no. 1, p. 15, 2017.
Sugiyono, Metode Penelitian Kombinasi (Mix Methods), Bandung: Alfabeta, 2015.
M. Maswar, “Analisiss Statistik Deskriptif Nilai UAS Ekonomitrika Mahasiswa dengan Program SPSS 23 & Eviews 8.1”,Jurnal Pendidikan Islam Indonesia, vol. 1, no. 2, p. 273, 2017.
A. Sholikhah, “Statistik Deskriptif Dalam Penelitian Kualitatif”, KOMUNIKA: Jurnal Dakwah dan Komunikasi, vol. 10, no. 2, p. 342, 2016.
T. Krisnawardhani, N. Salam, and D. Anggraini, “Analisiss Regresi Linear Berganda dengan Satu Variabel Boneka (Dummy Variabel)”, Epsilon: Jurnal Matematika Murni Dan Terapan, vol. 4, no. 2, p. 14, 2017.
A. Anggara, K. Auliasari, and Y.A. Pranoto, “Metode Regresi Linier Berganda Untuk Prediksi Omset Penyewaan Kamera di Joe Kamera”, Jurnal Mahasiswa Teknik Informatika, vol. 7, no. 1, p. 1, 2023.
W.A.L. Sinaga, S. Sumarno, and I.P. Sari, “The Application of Multiple Linear Regression Method for Population Estimation Gunung Malela District”. JOMLAI: Journal of Machine Learning and Artificial Intelligence, vol. 1, no. 1, p. 55, 2022.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 REKONSTRUKSI TADULAKO: Civil Engineering Journal on Research and Development

This work is licensed under a Creative Commons Attribution 4.0 International License.