Pemodelan Causal Loop Diagram Percepatan Proyek terhadap Biaya dan Kualitas Konstruksi
Pemodelan Causal Loop Percepatan Proyek terhadap Biaya dan Kualitas Konstruksi
DOI:
https://doi.org/10.22487/renstra.v7i1.820Keywords:
project acceleration, dynamic system, cost, quality, Causal Loop DiagramAbstract
Construction project acceleration is a strategy commonly implemented to overcome schedule delays; however, its application often results in increased costs and reduced work quality when not managed in a systematic and integrated manner. This condition reflects the presence of complex and dynamic interrelationships among time, cost, and quality as the three main elements within the triple constraint framework, which cannot be adequately analyzed using linear approaches. Failure to understand the interactions among these three aspects may lead to project inefficiencies and decreased overall performance. Therefore, an approach capable of explaining cause–effect relationships and feedback mechanisms within construction project systems is required. This study aims to model the causal relationships between project acceleration, cost, and quality in order to obtain a structural understanding of their dynamic interactions. The research method employs a system dynamics approach using causal loop diagram modeling supported by Vensim PLE 10.4.0 software. The research stages include system definition to determine boundaries and identify key variables, model formulation based on a literature review to establish intervariable relationships, and the development of causal loop diagrams to illustrate interactions and feedback structures within the system. The modeling results indicate that the developed system consists of twenty feedback loops and forty-six one-way relationships representing interactions among acceleration, cost, and quality factors within the context of project acceleration. These findings confirm that project acceleration, cost, and quality are not independent variables but are dynamically interconnected. The proposed model provides a conceptual contribution to strengthening systemic understanding in construction project management and can serve as a foundation for strategic decision-making related to more effective and sustainable project acceleration
Downloads
References
K. Harold, Project ManageMent A Systems Approach to Planning, Scheduling, and Controlling, New Jersey: John Wiley & Sons, 2025.
PMI, Optimize Risk Responses, Pennsylvania: Project Management Institute, 2021.
A.K. Hassan, A.Q. Adeleke, and T.D.M, “The Effects of Project Triple Constraint on Malaysia Building Projects”, Social Science and Humanities Journal,, vol. 3, no. 05, pp. 1222-1238, 2019.
T.A. Billah, Abdullah, and A.T. Bulba, “Analisis Faktor-Faktor Yang Mempengaruhi Triple Constraints Proyek Konstruksi Gedung di Provinsi Aceh dalam Masa Pandemi Covid 19”, Teras Jurnal: Jurnal Teknik Sipil, vol. 13, no. 1, pp. 99-112, 2023.
M. Natalia, Riswandi, D. Oktaviani, and M.H. Putri, “Analisis Faktor-Faktor Penyebab Kendala Triple Constraint Proyek Konstruksi di Kota Jakarta Akibat Pandemi Covid-19”, Siklus: Jurnal Teknik Sipil, vol. 7, no. 2, pp. 160-174, 2021.
A. Rizal, “Analisis Time Cost Quality Trade Off Pada Proyek Pembangunan Jembatan (Studi Kasus Proyek Pembangunan Jembatan Ngelo)”, Siimo Engineering: Journal Teknik Sipil, vol. 2, pp. 37-42, 2018. https://doi.org/10.31934/siimo.v2i1.446
C.G. Buyang and J. Buyang, “Pemodelan Faktor Keterlambatan Proyek Penataan Dermaga Lantamal Ambon dengan Sistem Dinamik”, Jurnal Simetrik, vol. 10, no. 2, pp. 355-361, 2020.
R. Ansari, M. Khalilzadeh, R. Taherkhani, and J. Antucheviciene, “Performance Prediction of Construction Projects Based on the Causes of Claims: A System Dynamics Approach”, Sustainability, vol. 14, no. 7, pp. 1-19, 2022. https://doi.org/10.3390/su14074138
A. Khadivar, M.D. Nayeri, A. Nazari, and P. Sangin, “Design Project Management Model with System Dynamics Approach”, International Journal of Project Management, vol. 44, no. 11, pp. 735-748, 2023.
F. Nazir and E.V. Yadav, “Factors Affecting Cost Overrun in Construction Projects”, International Journal of Engineering, vol. 9, no. 2, pp. 4831-4833, 2019. https://doi.org/10.35940/ijeat.b4415.129219
C.G. Martins, S.M. Bogus, and V. Valentin, “Perceptions of Construction Risks Due to Fast-Track Activity Overlapping”, Eng. vol. 4, no. 4, pp. 2879–2895, 2023. https://doi.org/10.3390/eng4040162
Jamal and M.R. Ian, “Analisis Faktor Penyebab Keterlambatan Proyek Konstruksi di Indonesia”, Kajiian Teknik Sipil, vol. 10, no. 1, pp. 1-8, 2025.
Syafril, A. Soekiman, and A.A.R. Pratiwi, “Analisis Faktor - Faktor Terkait Mitigasi Manajemen Risiko Pekerjaan Konstruksi Pada Preservasi Jalan Siborongborong Jalan ke Sibolga (Tarutung)-Jalan Sisingamangraja (Padangsidimpuan) Provinsi Sumatera Utara”, Jurnal Sosial dan Sains, vol. 5, no. 4, pp. 1-18, 2025. https://doi.org/10.59188/jurnalsosains.v5i4.32145
S.F. Amiano, A. Brita, P. Gawei, V.H. Puspasari, and A. Purwantoro, “Analisis Penjadwalan Proyek Menggunakan Metode Repetitive Scheduling Method”, Jurnal Teknik, vol. 10, no. 2, pp. 12986-12993, 2025.
vol. 10, no. 2, pp. 12986-12993, 2025.
D. Fardila and N.R. Adwayah, “Optimasi Biaya dan Waktu Proyek Konstruksi dengan Lembur dan Penambahan Tenaga Kerja”, Inersia Lnformasi dan Ekspose Hasil Riset Teknik Sipil dan Arsitektur, vol. 17, no. 1, pp. 35-46, 2021.
P. Zulhijjah, R. Djamaluddin, and D.P. Sari, “Analisis Percepatan Proyek Menggunakan Metode Crashing dengan Penambahan Jam Kerja Lembur Optimum”, Jurnal Ilmiah Teknik Unida, vol. 3, no. 1, pp. 16-27, 2022. https://doi.org/10.55616/jitu.v3i1.214
A.F. Akhirudin, “Percepatan Waktu Pengerjaan Proyek Konstruksi dengan Menggunakan Metode Fast Track”, Menara Jurnal Teknik Sipil, vol. 13, no. 1, pp. 26-4, 2018.
S.H. Rizqy, Optimalisasi Percepatan Pelaksanaan Proyek Gedung Extension Rawat Inap 3 Lantai RSU Kaliwates-Jember, Jember: Universitas Muhammadyah Jember, 2024.
P.E.D. Love, D.J. Edwards, and J. Smith, “Rework Causation: Emergent Theorectical Insights and Implications for Research”, Journal of Construction Engineering And Management, vol. 142, no. 6, pp. 1-21, 2016.
E. Oluwaseun, E. Nnadi, and J. Najjobyo, “Financial And Operational Effects of Cost Estimation Inaccuracy, Material Price Volatility, and Payment Delays in Nigerian Construction Projects”, Smart Construction and Sustainable Cities,, vol. 3, no. 29, pp. 1-13, 2025. https://doi.org/10.1007/s44268-025-00076-4
N.V. Tam, N.Q. Toan, D.T. Hai, and N.L.D. Quy, “Critical Factors Affecting Construction Labor Productivity: A Comparison Between Perceptions of Project Managers and Contractors”, Cogent Bussines Management, vol. 8, no. 1, pp. 1-14, 2021, https://doi.org/10.1080/23311975.2020.1863303
B. Saluy, M. Djamil, S. Madelan, and Y. Pangkey, “Analysis of Labor Overtime And Productivity In Construction Projects”, Seybold Report., vol. 17, no. 09, pp. 559-565, 2022. https://doi.org/10.5281/zenodo.7073499
Satriono and A. Sigit, “Optimalisasi Biaya Dan Waktu Proyek Menggunakan Metode Crashing Dengan Penambahan Waktu Kerja (Lembur) dan Sistem Kerja Shift”, Teknisia, vol. 23, no. 2, pp. 505-515, 2021.
Mirnayani and H. Paradiba, “The Impact of Overtime Duration Variations on Labor Productivity in Apartment Construction Projects: A Study on Engineering and Disaster Management in the Construction Sector”, Calamity: A Journal of Disaster Technology and Engineering, vol. 2, no. 2, pp. 116-131, 2025. https://doi.org/10.61511/calamity.v2i2.2025.1321
N.A.A. Aziz, M.S. Misnan, M. Mustapa, N.M. Shukery, and S.H. Mahmud, “Fast Track Construction: A Review of Potential Risks and Strategies in Project Management”, The International Journal of Research and Innovation in Social Science, vol. 9, no. 2454, pp. 4000-4016, 2025, https://dx.doi.org/10.47772/IJRISS.2025.90300318
A.M. Afify, K.M. Khorshid, and A.A. Radwan, “Predicting Potential Risks Associated With Fast-Track Projects”, Journal of Al-Azhar University Engineering Sector, vol. 19, no. 72, pp. 538–557, 2024. https://doi.org/10.21608/auej.2024.269209.1625
K.K. Naji, M. Gunduz, and M. Adalbi, “Analysis of Critical Project Success Factors - Sustainable Management of the Fast-Track Construction Industry”, Buildings, vol. 13, no. 11, pp. 1-17, 2023. https://doi.org/10.3390/buildings13112890
A.R. Anireddy, “Material Cost Fluctuations: Analyzing the Effects of Market Volatility on Civil Project Budgets”, International Journal of Scientific Research, vol. 13, no. 10, pp. 1606-1610, 2024.
S.S. Chandra, Chandra, S.M., Sepasgozar, V.R.P. Kumar, A.K. Singh, L. Krishnaraj, and B.O. Awuzie, “Assessing Factors Affecting Construction Equipment Productivity using Structural Equation Modeling”, Buildings, vol. 13, no. 2, pp. 1-15, 2023. https://doi.org/10.3390/buildings13020502
S. Dong, M. Ahmed, and V. Chatpattananan, “Analysis of Key Factors of Cost Overrun in Construction Projects Based on Structural Equation Modeling”, sustainability, vol. 17, no. 5, pp. 1-14, 2025. https://doi.org/10.3390/su17052119
S. Alshihri, K. Al-Gahtani, and A. Almohsen, “Risk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia”, Buldings, vol. 12, no. 7, pp. 1-14, 2022. https://doi.org/10.3390/buildings12070902
F.A. Suryawinata, “Analisis Faktor-Faktor Penyebab Cost OverrunsProyek Konstruksi Gedung: Kajian Literatur Sistematis”, Journal of Sustainable Construction, vol. 4, no. 1, pp. 77-88, 2024.
O. Afana, R. Al Zubaidi, S.A. Dabous, and F. Ibrahim, “Categories and Factors of Cost Overrun in Construction Projects: A Systematic Review”, Engineering, Technology & Applied Science Research, vol. 14, no. 6, pp. 18330-18347, 2024. https://doi.org/10.48084/etasr.9006
M. Waty and H. Sulistio, “Impact of Change Orders on Decreasing Labor Productivity in Road Construction Projects (Approach using Structural Equation Modeling)”, Management and Production Engineering Review, vol. 15, no. 4, pp. 1-12, 2024, https://doi.org/0.24425/mper.2024.153114
Y. Mattar, M.A. Alzaim, M. AlAli, I. Alkhatib, and S. Beheiry, “The Impact of Change Orders Caused by Legislative Changes on Program Management in the UAE Construction Industry”, Buildings, vol. 14, no. 5, pp. 1-25, 2024. https://doi.org/10.3390/buildings14051294
K.S. Al-Tameemi, “The Impact of Schedule Compression Techniques on Construction Project Timelines: A Case Study in Basrah , Iraq”, Open Civil Engineering Journal, vol. 18, no. 1, pp. 1-12, 2024, https://doi.org/10.2174/0118741495360335241205110710
E.M.H.Ismaeil and A.E.E. Sobaih, “A Proposed Model for Variation Order Management in Construction Projects”, Buildings, vol. 14, no. 3, pp. 1-16, 2024. https://doi.org/10.3390/buildings14030726
J.S. Ramadhan, “Impact of Change Orders on Cost Overruns and Delays in Large-Scale Construction Projects”, Engineering, Technology & Applied Science Research, vol. 15, no. 1, pp. 20291-20299, 2025. https://doi.org/10.48084/etasr.9449
A. Chadee, H. Ali, S. Gallage, and U. Rathnayake, “Modelling the Implications of Delayed Payments on Contractors’ Cashflows on Infrastructure Projects”, Civil Engineering Journal, vol. 9, no. 01, pp. 52-71, 2023. http://dx.doi.org/10.28991/CEJ-2023-09-01-05
A. Raditya, S. Hardjomuljadi, and M. Amin, “Faktor Dampak Keterlambatan Pembayaran Kontraktor Kepada Subkontraktor Pada Proyek Jalan Tol”, Konstruksia, vol. 13, no. 7, pp. 1-16, 2021. https://doi.org/10.24853/jk.13.1.1-16
Nurlaelah and I. Rahmattullah, “The Impact of Construction Material Supply Delays on Contractor X in Jakarta , Indonesia”, Engineering and Technology Journal, vol. 10, no. 5, pp. 4657-4661, 2025, https://doi.org/10.47191/etj/v10i05.01.
R. Ananda, E. Mulyani, and Rafie, “Analisis Keterlambatan dan Kualitas Hasil Pekerjaan Pada Proyek Konstruksi Gedung”, JeLAST: Jurnal Teknik Kelautan , PWK , Sipil, dan Tambang, vol. 8, no. 1, pp. 1-7, 2021. https://doi.org/10.26418/jelast.v8i1.46036
M. Latif, E. M. Saleem, and D.S.M. Cheema, “Analyzing the Key Factors Contributing to Project Delays in the Construction Industry: A Comprehensive Study”, Journal of Development and Social Sciences, vol. 4, no. 3, pp. 936-944, 2023. https://doi.org/10.47205/jdss.2023(4-III)85
S. Wijayanthi and A. Al Huda, “Analisis Faktor-Faktor yang Mempengaruhi Kualitas Pekerjaan pada Proyek Konstruksi”, Prosisding Semininar Keinsinyuran 2023, pp. 976-982, 2023.
E.F. Atwan, Enhancing Construction Document Integrity A Comprehensive Approach to Measure and Improve Quality, Boca Raton: CRC Press, 2024.
Y.I. Silalahi, L. Masthura, and N. Fahriana, “Analisis Faktor - Faktor Penentu Keberhasilan Proyek Konstruksi Berdasarkan Mutu, Biaya dan Waktu”, Jurnal Komposit, vol. 7, no. 2, pp. 233-239, 2023. https://doi.org/10.32832/komposit.v7i2.14240
A.S. Williams, Quality Control Measures in Construction Projects, Boca Raton: CRC Press, 2025.
C. Araújo-Rey and M. A. Sebastián, “An Approach to the Analysis of Causes of Delays in Industrial Construction Projects through Planning and Statistical Computing”, Sustainability, vol. 3, no. 7, pp. 1-16, 2021. https://doi.org/10.3390/su13073975
E.O. Elgendi and A.A. Mohy, “An Impact Of Equipment Selection on Construction Projects: Case Study of A Road Project in Egypt”, Journal of Applied Engineering Science, vol. 20, no. 4, pp. 1271-1281, 2022. https://doi.org/10.5937/jaes0-38963
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 REKONSTRUKSI TADULAKO: Civil Engineering Journal on Research and Development

This work is licensed under a Creative Commons Attribution 4.0 International License.





This work is licensed under a 