Rosyidi, M. F., Ghifari, F., Yudoprasetyo, K., Hariyanto, I. R. and Sandi Asmoro, A. B. . (2026) “Evaluasi dan Redesain Fondasi Abutment akibat Tiang Bor Tidak Mencapai Kedalaman Rencana: Studi Kasus Jembatan Palu 4”, REKONSTRUKSI TADULAKO: Civil Engineering Journal on Research and Development, 7(2), pp. 149-158. doi: 10.22487/renstra.v7i2.883.