[1]
Fadjar, A., Nirmalawati, N. and Hidayat, N. 2022. Estimating Project Completion Time with Monte Carlo Simulation. REKONSTRUKSI TADULAKO: Civil Engineering Journal on Research and Development. 3, 2 (Aug. 2022), 21-26. DOI:https://doi.org/10.22487/renstra.v3i2.448.